{"id":215,"date":"2023-02-21T08:10:26","date_gmt":"2023-02-21T08:10:26","guid":{"rendered":"https:\/\/bim4housing.com\/iq-contractual\/?page_id=215"},"modified":"2023-02-21T08:16:26","modified_gmt":"2023-02-21T08:16:26","slug":"contractual-workstream-what-good-looks-like-brainstorm","status":"publish","type":"page","link":"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-what-good-looks-like-brainstorm\/","title":{"rendered":"Contractual Workstream &#8211; &#8216;What good looks like&#8217; brainstorm"},"content":{"rendered":"<div id=\"pg-215-0\"  class=\"panel-grid\" ><div class=\"panel-grid-core\"><div id=\"pgc-215-0-0\"  class=\"panel-grid-cell \" ><div class=\"panel-widget-style\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2><strong>Contractual Workstream - 'What good looks like' brainstorm-20220321<\/strong><\/h2>\n<p>George: The incompleteness of the M&E design is significant, from a coordination perspective, largely because of the procurement process which actually adds a lot of unnecessary penetrations. <\/p>\n<p>It would be excellent if by the time we get to gateway two design was complete ready for stage 4 design and there is still the correct amount of design time at the front end. <\/p>\n<p>George: re the change management process, they are putting off the selection of products and materials for later, because they perceive that it is transferring risk onto the supply chain. If products are selected earlier, we can simplify (and consequently) de-risk the process. Compartmentation is one of the biggest issues, but we\u2019re probably only looking at 50 or 60 types of assets. We should concentrate on those and have the right parametric information so that when a product is changed later on the impact of the penetration is more limited. <\/p>\n<p>PREPERATION OF EMPLOYER\u2019S REQUIREMENTS<\/p>\n<p>SCHEDULE ONE Design submission procedure. <\/p>\n<p>Paul: It\u2019s important the manufacturer foresees any kind of problems that will come later on in the process and to register it.<\/p>\n<p>George: It\u2019s important that we try and address the process of identifying what is actually causing the risk and therefore being able to evidence the fact it\u2019s being dealt with. The Housing Association property mutual process potentially has a method of addressing this. It looks at things that go wrong and it\u2019s either the materials, the workmanship or the design. What the building performance group did was focus on doing those so that there was far more clarity in terms of that work. By having rigorous plant of work inspections, it meant that the incidence of failure reduced hugely and that\u2019s why the property mutual worked. <\/p>\n<p>The pre-construction process is crucially important. The latest trend is to shift it to the left, which means that focus has shifted away from what we are doing on site to what we are doing before we get to the site.<\/p>\n<p>George: What we can do about the red lines?\/red list idea? Is to take that back to the duty holder group, people who have currently got that responsibility, and get them to feed that back into their development colleagues, because at the moment the development colleagues are going to be driven by the normal sort of commercial things that are causing the problem. They can come back at it through the health & safety and liability side of things rather than the commercial.<\/p>\n<p>There ae more and more questions about embedded carbon.<\/p>\n<p>The interrelationship between different assets is important, you know what goes to make up a compartment and also the standards that they need to adhere to.<\/p>\n<p>George\u2019s strategy: 3 or 4 years ago started talking to People in development teams \u2013 those who are interested are outnumbered by those who are not interested. Through them I started meeting asset managers and property managers, eventually focusing on the duty holders because they are the ones who will be legally carrying the can; therefore, they are sensible people looking at it from a practical\/self-preservation perspective.<\/p>\n<p>The duty holders should be able to say to the development people that this is the quality of information\/evidence\/digital records that I need before I\u2019m willing to sign that off now. <\/p>\n<p>Regarding the HSE and treatments, for those treatments to work we need eg this type of asset to be installed to this level of quality with this information.<\/p>\n<p>George has been talking to the constructors and manufacturers in BIM4housing and they\u2019ve told me about essential characteristics. These are built into the product standards that most factories comply with to provide their information to sell their products. But getting to what those essential characteristics are is difficult because they are locked up in standards. There are declarations of performance and something called EAD which is for products that don\u2019t have a declaration of performance. We\u2019ve looked at what are the values in the declaration of performance \u2013 remarkably there is no master library of what these characteristics are. <\/p>\n<p>Paul talks about the compatibility of different parts of an asset eg fire curtain, and how there are nuances regarding the compatibility. <\/p>\n<p>What we haven\u2019t done very well with BIM is map the information requirements for the end users. <\/p>\n<p>Richard: we need a proper marketing strategy to get this stuff out there...where are those messages going and how are they going to get there?<\/p>\n<p>George: we could feed it back through the supply chain sustainability school.<\/p>\n<p>Martin: should use caution about marketing and getting the message out re tier 1s and possible collusion...to not make a set of demands, as if holding hostage.<\/p>\n<p>WHAT TO DO NEXT? Martin: We\u2019re thinking about a downstream set of conditions, advice guidance eg this is what you're going to need before you get ready to engage. This is the digital journey. This is what you need before you can get to gateway two. If you take standard and fair contracts and try and offset this risk it isn\u2019t going to go down well with the agency or the insurance industry because it\u2019s limited...<\/p>\n<p>Then, we can do a piece of work re this is what we\u2019re going to need from the supply chain downstream in terms of the digital journey and the information that\u2019s going to needed to fed into getting through gateway 2.<\/p>\n<p>George: We have to look at the process of products and materials they submitted and how is design agreed with the client and get the client to recognise that for us to be able to deliver the quality that they are expecting. Then some changes need to be taken earlier in the in the process. We need to address those things and modify contracts to these standard contracts is not the way of doing that...we have to be more collaborative in the process.<\/p>\n<p>Martin: offsetting risks through modifications to contracts is no substitute for engagement and resolving the risks and identifying them.<\/p>\n<p>The Building safety bill is about profound change and what we haven\u2019t got is a roadmap. We\u2019ve got a picture of the future. What we need to do is work out how we've changed the procurement process and to evolve the procurement process to support a better construction sector.<\/p>\n<\/div>\n<\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Contractual Workstream &#8211; &#8216;What good looks like&#8217; brainstorm-20220321 George: The incompleteness of the M&#038;E design is significant, from a coordination perspective, largely because of the procurement process which actually adds a lot of unnecessary penetrations. It would be excellent if by the time we get to gateway two design was complete ready for stage 4&#8230;<\/p>\n<p class=\"more-link\"><a href=\"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-what-good-looks-like-brainstorm\/\" class=\"\"><span>Read More<\/span><i>&#43;<\/i><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-215","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Contractual Workstream - &#039;What good looks like&#039; brainstorm - IQ Contractual<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-what-good-looks-like-brainstorm\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Contractual Workstream - &#039;What good looks like&#039; brainstorm - IQ Contractual\" \/>\n<meta property=\"og:description\" content=\"Contractual Workstream - &#039;What good looks like&#039; brainstorm-20220321 George: The incompleteness of the M&amp;E design is significant, from a coordination perspective, largely because of the procurement process which actually adds a lot of unnecessary penetrations. It would be excellent if by the time we get to gateway two design was complete ready for stage 4&#8230;Read More&#043;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-what-good-looks-like-brainstorm\/\" \/>\n<meta property=\"og:site_name\" content=\"IQ Contractual\" \/>\n<meta property=\"article:modified_time\" content=\"2023-02-21T08:16:26+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/contractual-workstream-what-good-looks-like-brainstorm\\\/\",\"url\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/contractual-workstream-what-good-looks-like-brainstorm\\\/\",\"name\":\"Contractual Workstream - 'What good looks like' brainstorm - IQ Contractual\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/#website\"},\"datePublished\":\"2023-02-21T08:10:26+00:00\",\"dateModified\":\"2023-02-21T08:16:26+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/contractual-workstream-what-good-looks-like-brainstorm\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/contractual-workstream-what-good-looks-like-brainstorm\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/contractual-workstream-what-good-looks-like-brainstorm\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Contractual Workstream &#8211; &#8216;What good looks like&#8217; brainstorm\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/#website\",\"url\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/\",\"name\":\"IQ Contractual\",\"description\":\"IQ Contractual Workstreams\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Contractual Workstream - 'What good looks like' brainstorm - IQ Contractual","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-what-good-looks-like-brainstorm\/","og_locale":"en_US","og_type":"article","og_title":"Contractual Workstream - 'What good looks like' brainstorm - IQ Contractual","og_description":"Contractual Workstream - 'What good looks like' brainstorm-20220321 George: The incompleteness of the M&E design is significant, from a coordination perspective, largely because of the procurement process which actually adds a lot of unnecessary penetrations. It would be excellent if by the time we get to gateway two design was complete ready for stage 4&#8230;Read More&#43;","og_url":"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-what-good-looks-like-brainstorm\/","og_site_name":"IQ Contractual","article_modified_time":"2023-02-21T08:16:26+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-what-good-looks-like-brainstorm\/","url":"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-what-good-looks-like-brainstorm\/","name":"Contractual Workstream - 'What good looks like' brainstorm - IQ Contractual","isPartOf":{"@id":"https:\/\/bim4housing.com\/iq-contractual\/#website"},"datePublished":"2023-02-21T08:10:26+00:00","dateModified":"2023-02-21T08:16:26+00:00","breadcrumb":{"@id":"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-what-good-looks-like-brainstorm\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-what-good-looks-like-brainstorm\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-what-good-looks-like-brainstorm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bim4housing.com\/iq-contractual\/"},{"@type":"ListItem","position":2,"name":"Contractual Workstream &#8211; &#8216;What good looks like&#8217; brainstorm"}]},{"@type":"WebSite","@id":"https:\/\/bim4housing.com\/iq-contractual\/#website","url":"https:\/\/bim4housing.com\/iq-contractual\/","name":"IQ Contractual","description":"IQ Contractual Workstreams","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bim4housing.com\/iq-contractual\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/pages\/215","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/comments?post=215"}],"version-history":[{"count":3,"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/pages\/215\/revisions"}],"predecessor-version":[{"id":218,"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/pages\/215\/revisions\/218"}],"wp:attachment":[{"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/media?parent=215"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/categories?post=215"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/tags?post=215"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}