{"id":201,"date":"2023-02-21T07:37:02","date_gmt":"2023-02-21T07:37:02","guid":{"rendered":"https:\/\/bim4housing.com\/iq-contractual\/?page_id=201"},"modified":"2023-02-21T07:46:47","modified_gmt":"2023-02-21T07:46:47","slug":"contractual-workstream-session-3","status":"publish","type":"page","link":"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-session-3\/","title":{"rendered":"Contractual Workstream &#8211; Session 3"},"content":{"rendered":"<div id=\"pg-201-0\"  class=\"panel-grid\" ><div class=\"panel-grid-core\"><div id=\"pgc-201-0-0\"  class=\"panel-grid-cell \" ><div class=\"panel-widget-style\" style=\"background: url(&quot;false&quot;) !important; background-position: left top !important; background-repeat: repeat !important; background-size: auto !important; background-attachment: scroll !important;\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2><strong>Contractual Workstream - Session 3-20220620<\/strong><\/h2>\n<p>PAUL McSOLEY says, looking at the government website, that even though the regulator will not look at certain types of buildings if you don\u2019t follow the same process and it goes wrong then they will look at it - this means the rules, in reality, apply to everything. GEORGE agrees. PAUL says if you haven\u2019t got a management strategy at gateway 1 you will get into trouble. Re the staged plans approach, you can\u2019t submit everything at a point in time, it has to be in stages due to the complications of projects.<\/p>\n<p>The big risks is that if you do it in traditional format the regulator may come back with some questions. If you put stuff in in staged approaches and all the products are not fully known you\u2019ll have to go through the same thing twice at gateway 2. The big things we\u2019re judged by is discrepancy is trumped by adequacy which is trumped by statutory matters.<\/p>\n<p>MARTIN believes that both the Building Safety Act and the Golden Thread will apply to all buildings. But just buildings: there are still unregulated sectors in the industry which are not buildings. It will be a big change, which is a hell of a thing - in an organisation of 25,000 people we are changing the management system. GEORGE asks if he\u2019s made any progress talking to his procurement colleagues. MARTIN replies yes, but he\u2019s starting from ground zero with it. Getting quality onto the agenda with procurement colleagues is the first step.<\/p>\n<p>MARTIN thinks that information bought by main contractors as a prequel service from companies who have checked through supply chains accounts are rubbish and don\u2019t ask the right question, especially about quality. GEORGE replies that such companies are intermediaries who collect information that probably doesn\u2019t need an intermediary to collect if you\u2019ve got properly structured data. What we should be doing is using more standardised data so that type of interrogation can be done in a standardised way.<\/p>\n<p>The intermediary can never collect all the information that you actually need to make the right assessments. Currently, there is so much data and so many different standards that its overwhelming - no body can possibly be on top of it all. What everybody wants is a simple answer which means the questions have to be simplified to achieve this.<\/p>\n<p>PAUL MCSOLEY says you have to break it down to into all the different bits (doors, flues, ducts etc) and say what is the input value you want for all of these. System thinking is important and 90% of people in Construction don\u2019t know how to do it - they just want to know \u2018is it compliant?\u2019\u2026compliant against what? You have to ask, using BIM, at the beginning, what values do you want? MARK thinks the vast majority of the industry does not get the complexity of the situation and its possible things will be the same in 18 months time.<\/p>\n<p>MARK says that this didn\u2019t start with the Buildings Safety Act, there is nothing new here. He thinks one of the most significant risks is compliance timings with the building safety regulator and falling over, but in terms of the information it should be stuff that we are doing anyway. Something he is struggling with on a current project is pulling the right information out of the supply chain because its all coming out in different forms and different parameters - consequently he struggles to validate his number back top the client to say this is how much he believes it will cost, theres a lot of risk.<\/p>\n<p>IAN is closer to getting the procurement research out which is helpful as some data and information is needed to support the conversations taking place. Re the Building Safeties Act, everyone comes to the same conclusion about what it means but what\u2019s a struggle is how to get there. Which order of things? Lack of standardisation is critical. Re-reading the Latham rReport, he realises if they could do everything within it we could pretty much fix construction. \u2018Specialist Industry Contractors\u2019 mentioned in the report never happened. Engineers are needed back in construction. The design-responsibility matrix is key: who is responsible for what in this process. He agrees with Paul about the systems based approach, but he still doesn\u2019t know what the systems are.<\/p>\n<p>PAUL says there has been nothing different since the Latham report. You have to go back to basics - what\u2019s an architects primary function? Often on projects when someone says they are a Designer they are actually a co-ordinator of the design of others, whether its structural, internals etc\u2026.The Lead Consultant is not an architect, it\u2019s the person in charge of the contract. Whoever is paying the fees of the architect they become the lead consultant. How is it their fault if I\u2019m designing and building a job and I\u2019ve bought a product that doesn't work with another product? On a CM job the lead consultant would be the client because they are paying for the consultant, on a design &amp; build its him - this is one of the biggest faults of the industry.<\/p>\n<p>GEORGE has been looking at the systems based approach over the last few months. It\u2019s difficult to define in regards to the fabric: what is the groupings that we should be considering there? Compartmentation should be considered to be a system, but where would doors fit? The term \u2018system\u2019 is mixed up with work packages. What are the systems that go to make up the building? MARK says would you not considering the building as the system and then everything else is a sub-system. A system for George is a group of items that are performing a function.<\/p>\n<p>IAN thinks it\u2019s almost impossible to argue the case for a door being a system because a door has to work within a wall. Structure is the most important system as that is what holds the building up, the interior system and faced are there to protect the structure and then to form the compartments inside. M&amp;E is the hearts and lungs that have to cut through the buildings. Everything after the five main systems is a sub-system. In the interior system the lynch-pin of the system is the wall. The door is a sub-system of the wall system. GEORGE says a door is part of the compartment (for fire purposes) but it's also security.<\/p>\n<p>PAUL says that the lynch-pin in a University halls of residence is around sleeping risk. You have to look at hierarchy. generally how he describes buildings is FATW - Fire, Acoustics, Thermal, Water. Using purpose group, if you\u2019ve got a flat then you start breaking it out from that purpose group, how do you hierarchy it down. MARTIN says it\u2019s the usage of a building that defines most of what they are talking about.<\/p>\n<p>PAUL shows a diagram of a fire fighting shaft on screen.Regarding the fire shaft, the whole systems approach can cause issues as there are quite a few variables that come down to choice. Dry wall is often being used when it is not fit for purpose. If it\u2019s done as a smoke control shaft you have to input the right data: temperature, pressure, etc. People are often selecting the wrong materials. GEORGE says there may be other contractors who do hot have Paul\u2019s knowledge and therefore they would not be able to spot that particular issue. Is there a way of turning that scenario into questions that could then inform somebody how to check something.<\/p>\n<p>PAUL says that there is. looking at systems, a room is the right way to look at it: a fire fighting shaft, it\u2019s a room; an office floor that connects to it, that\u2019s a room. You can ask the questions but you can\u2019t escape the fact you need a slight working knowledge of how these things work. IAN says that this conversation should theoretically happen earlier rather than later. He considers that the point of the Gateways is that you will get thrown back to the prior gateway, you won\u2019t be allowed to start work until that issue has been resolved.<\/p>\n<p>PAUL thinks you have to be careful of the staged plans approach. If its structurally fire safe and it\u2019s all been described correctly they\u2019ll say crack on, what they are not saying crack on is that everything else works with it\u2026If they go through a staged approach, no one says a word until they get on-site, put the drawings to work and find that nothing is co-ordinated. MARTIN says the Regulator will not spot all these problems. PAUL reiterates again that you have to break it into rooms: you can look at the purpose group of the building, then look at the type of rooms that you\u2019ve got in it.<\/p>\n<p>PAUL agrees with GEORGE that they could be called \u2018spaces\u2019 rather than \u2018rooms\u2019. Spaces is more generic. IAN says that if we talk about system-led build, how do we define the system? As a system breakdown and how to prioritise against that as we move back out. PAUL says about gateway 2, because they are going to do staged approaches, it\u2019s never going to end at the end of stage 4, it\u2019s going to go right to the end of stage 5 because there will always be change going through in this process. GEORGE thinks progressive assurance should be applied to re-submit back top the gateway (go through a loop) as the design develops. MARTIN sys this idea contradicts many industry conversations about having to have the gateways all ready before the next stage.<\/p>\n<p>IAN says that, generally, the industry needs to be better at selecting the right material for the right job. he doesn\u2019t think any dry liner would care if there was more stuff with block if the drylining bit was easier to manage.<\/p>\n<p>GEORGE talks about the fire breaking out scenario that they worked through at Digital Construction Week. They looked at how the various different systems would perform to mitigate the spread of smoke and to enable evacuation. The groups had to look at it from their specific group point of view (construction, operations etc). They had to check whether the tables contained the right information and also look at RACI: who was responsible and accountable. They then turned what was in the description into questions. In the follow session of the construction group there were breakout groups where they were asked who they could expect that information from.<\/p>\n<p>The goal, says GEORGE, is to add this to a task information delivery plan to say who are the people that could provide that information. He thinks that probably the next task is to go through what is in the description column and really determine whether which is the most important information, That will vary according to the context and the people who want the information. Here, the technology comes in as we can collect and curate information that\u2019s needed by different people for different purposes. In response to IAN\u2019s question as to what will be the output from this, George replies \u2018we\u2019re putting it into data templates which can be used in applications e.g. particular questions could be transformed into a data set which could be used within Revit, or a procurement package etc.<\/p>\n<p>PAUL says the key thing that needs to be known about a damper in a wall is what category it is. The manufacturer is often blamed for that, but they are not the one who is in charge of the strategy of the building. GEORGE says they want to get to a point of saying what is the base material: if there are six different types of material there would be a drop down. PAUL says you may have to look at not just what the material is but also what classification do you want? People have to be guided as there are endless possibilities if you have limited knowledge on the subject. MARK says sometimes you will have to move outside of the set of standard answers, then you need another work flow. He thinks it links in with the competence discussion as you cannot have an individual who is competent across all activities of the construction industry.<\/p>\n<p>Regarding procurement, PAUL says that people actually have 50 more options available than they have in their own head, that\u2019s part of the problem. MARTIN thinks it\u2019s heading towards \u2018can we capture sufficient questions and drop-down answers to do some standard technical solutions\u2019. It\u2019s binary: yes or no answers. But due to the degree of complexity that will take a long time. Once you\u2019ve got there another element is the non-bespoke, the \u2018what-ifs\u2019. People will inevitably come up with alternatives to the standard technical solution because they will want to play with it. Unless we try and simplify it, it won\u2019t be available in a workable form.<\/p>\n<p>GEORGE shares the \u2018what properties do we need?\u2019 document on screen. he has downloaded a door that has 210 properties against it, the only one was?\u2026fire rating. NBS and Firey use different terminology, they are different ways of getting to the same answer. He\u2019s not suggesting to limit them, but they are different questions. If you are using revit you\u2019\u2019 probably create a door family and an architect will create shared parameters for the properties they want to hold - fire rating etc. There\u2019s a plethora of different standards to use to do that. The biggest challenge is that if someone uses another door they are also potentially using Revit and they\u2019ll create their own shared parameters so we don\u2019t have anything that is properly interoperable.<\/p>\n<p>The new standards are brought in with a range of different properties. To be able to output this and comply with the S 8644 somebody will have to put this into all of their families and they have to make sure they spell it right because it\u2019s not coming from a shared resource. We can solve this: if we can agree what these properties can be it can go into our software and we\u2019ve got API connections into revit. The data can be managed in the database. It\u2019s still part of the BIM models but you have it in a proper machine readable form. We can use the technology to simplify the way it is presented.<\/p>\n<p>PAUL says the trouble with the devisers of 8644 is that they don\u2019t want to get into the weeds of this but it cannot be avoided. GEORGE quotes IAN via chat: its data with the expertise.It needs to be put into reusable data libraries that have that context in which to use it. GEORGE says they all seem to agree that they nedd to add structure to the data to make it more addressable and also run more workshops to capture that. The scenarios are really important, we need to work out what they can be.<\/p>\n<\/div>\n<\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Contractual Workstream &#8211; Session 3-20220620 PAUL McSOLEY says, looking at the government website, that even though the regulator will not look at certain types of buildings if you don\u2019t follow the same process and it goes wrong then they will look at it &#8211; this means the rules, in reality, apply to everything. GEORGE agrees.&#8230;<\/p>\n<p class=\"more-link\"><a href=\"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-session-3\/\" class=\"\"><span>Read More<\/span><i>&#43;<\/i><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-201","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Contractual Workstream - Session 3 - IQ Contractual<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-session-3\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Contractual Workstream - Session 3 - IQ Contractual\" \/>\n<meta property=\"og:description\" content=\"Contractual Workstream - Session 3-20220620 PAUL McSOLEY says, looking at the government website, that even though the regulator will not look at certain types of buildings if you don\u2019t follow the same process and it goes wrong then they will look at it - this means the rules, in reality, apply to everything. GEORGE agrees.&#8230;Read More&#043;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-session-3\/\" \/>\n<meta property=\"og:site_name\" content=\"IQ Contractual\" \/>\n<meta property=\"article:modified_time\" content=\"2023-02-21T07:46:47+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/contractual-workstream-session-3\\\/\",\"url\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/contractual-workstream-session-3\\\/\",\"name\":\"Contractual Workstream - Session 3 - IQ Contractual\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/#website\"},\"datePublished\":\"2023-02-21T07:37:02+00:00\",\"dateModified\":\"2023-02-21T07:46:47+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/contractual-workstream-session-3\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/contractual-workstream-session-3\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/contractual-workstream-session-3\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Contractual Workstream &#8211; Session 3\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/#website\",\"url\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/\",\"name\":\"IQ Contractual\",\"description\":\"IQ Contractual Workstreams\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/bim4housing.com\\\/iq-contractual\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Contractual Workstream - Session 3 - IQ Contractual","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-session-3\/","og_locale":"en_US","og_type":"article","og_title":"Contractual Workstream - Session 3 - IQ Contractual","og_description":"Contractual Workstream - Session 3-20220620 PAUL McSOLEY says, looking at the government website, that even though the regulator will not look at certain types of buildings if you don\u2019t follow the same process and it goes wrong then they will look at it - this means the rules, in reality, apply to everything. GEORGE agrees.&#8230;Read More&#43;","og_url":"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-session-3\/","og_site_name":"IQ Contractual","article_modified_time":"2023-02-21T07:46:47+00:00","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-session-3\/","url":"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-session-3\/","name":"Contractual Workstream - Session 3 - IQ Contractual","isPartOf":{"@id":"https:\/\/bim4housing.com\/iq-contractual\/#website"},"datePublished":"2023-02-21T07:37:02+00:00","dateModified":"2023-02-21T07:46:47+00:00","breadcrumb":{"@id":"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-session-3\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-session-3\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/bim4housing.com\/iq-contractual\/contractual-workstream-session-3\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bim4housing.com\/iq-contractual\/"},{"@type":"ListItem","position":2,"name":"Contractual Workstream &#8211; Session 3"}]},{"@type":"WebSite","@id":"https:\/\/bim4housing.com\/iq-contractual\/#website","url":"https:\/\/bim4housing.com\/iq-contractual\/","name":"IQ Contractual","description":"IQ Contractual Workstreams","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bim4housing.com\/iq-contractual\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/pages\/201","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/comments?post=201"}],"version-history":[{"count":4,"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/pages\/201\/revisions"}],"predecessor-version":[{"id":205,"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/pages\/201\/revisions\/205"}],"wp:attachment":[{"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/media?parent=201"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/categories?post=201"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bim4housing.com\/iq-contractual\/wp-json\/wp\/v2\/tags?post=201"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}