{"id":211,"date":"2024-04-02T14:03:02","date_gmt":"2024-04-02T14:03:02","guid":{"rendered":"https:\/\/bim4housing.com\/development\/?page_id=211"},"modified":"2024-04-02T15:33:03","modified_gmt":"2024-04-02T15:33:03","slug":"bim4housing-development-working-group-meeting-27-03-2024","status":"publish","type":"page","link":"https:\/\/bim4housing.com\/development\/bim4housing-development-working-group-meeting-27-03-2024\/","title":{"rendered":"BIM4HOUSING DEVELOPMENT WORKING GROUP MEETING 27-03-2024"},"content":{"rendered":"<div id=\"pg-211-0\"  class=\"panel-grid\" ><div class=\"panel-grid-core\"><div id=\"pgc-211-0-0\"  class=\"panel-grid-cell \" ><div class=\"panel-widget-style\" style=\"background: url(&quot;false&quot;) !important; background-position: left top !important; background-repeat: repeat !important; background-size: auto !important; background-attachment: scroll !important;\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h2><strong>BIM4HOUSING DEVELOPMENT WORKING GROUP MEETING 27-03-2024<\/strong><\/h2>\n<p>RICHARD We\u2019ve got another four sessions next week, so we thought it would a good idea to run through with the development group what we\u2019ve done so far and then maybe you can give us a steer on what we\u2019re getting right or wrong and to add some input as well. The first question: how do we prevent incorrect design selection and installation of fire safety products? The overall considerations are competence, online register and the role of the insurers. These are the highpoint notes which have been attached to each section, we\u2019ve highlighted any kind of answer. We didn\u2019t get hows to everything, but to some. If we have a national occupational standard for a particular trade then ultimately that could be the accepted recognition that you\u2019ve got these standards.<\/p>\n<p>Chris Hall was saying that basically the training and setting up the standards and qualifications for this is all under one through the ASFP, they\u2019ve been working with the IFS and have created a Fire Sector Safety Group. And then looking to publish standards on competency and then working on designer competency.so basically he\u2019s saying that it\u2019s in process and it\u2019s going to be another year. Assessing everyone\u2019s individual and organisational capacity to act as a designer and specifically looking at fire safety as a bespoke element of design work. So that\u2019s something they\u2019re actually doing themselves, Sarah Stevenson\u2019s company. Chris Hall reiterating, we\u2019re working on design competency as we speak.<\/p>\n<p>The latest thinking that we\u2019re doing is linking task-based activities to continuous updates of competency built upon those frameworks and qualifications. Maintaining an online register recording responsible competent individuals and their decisions will be part of the how to fulfil that first section of the question. Again, Chris Hall, the ASFP scheme will include a registration as well. George spoke on behalf of Alistair Brockett who said it would be a good idea to encourage the use of the LPC (Loss Prevention Council). Has anybody got any comments on that? That\u2019s all around the competency side of this issue. Basically Chris Hall is saying that it\u2019s in hand and Sarah Stevenson is saying this is what we\u2019re doing already, while it\u2019s in hand. They\u2019ve gone quite a way along the path for validating competency.<\/p>\n<p>The last part of that was around utilising insurance companies. How do we do that? We talk to them. George, you\u2019re already doing that.<\/p>\n<p>GEORGE Yes, we\u2019re speaking with specialist brokers. We\u2019re trying to work with them to see what information is likely to be accepted by the actuaries. So we\u2019ve got three specialist insurance brokers involved in that. Any suggestions on that would be welcome.<\/p>\n<p>RICHARD We\u2019ll move on to the second thing which was considerations at planning stage. This is around contractual agreements and planning and design. Will Cousins talking in terms of design &amp; build, what he did recently was a two-stage tender with a PCSA, so it\u2019s going to be design and then build. If I remember correctly the meeting was pretty unanimous in saying that that\u2019s the way that it\u2019s going to be and it\u2019s going to have to go in that direction. Will Cousins again, in terms of the contract, we basically don\u2019t get in to a contract until you get you gateway 2 submission, so we\u2019ve got a year tender process. Is that longer than it would normally be? Or is that a reasonable amount of time?<\/p>\n<p>PAUL ECCLES (Peabody Housing) There is a government procurement guidance with a foreword by Judith Hackitt, it came out just over a year ago, that says that when you go into a build contract you want to try and get the PC involved as early in the design stage as possible, so they can support the PDs in identifying the challenges in the construction of that design. I can circulate the link to that, it\u2019s on the government website.<\/p>\n<p>GEORGE What do you do at Peabody? Are you in design or project management?<\/p>\n<p>PAUL ECCLES I\u2019m a Health &amp; Safety Manager. Before we amalgamated I was Health &amp; Safety Manager and did fire safety as well for business. So, since Grenfell I was running around like a two-headed dog, as you ca imagine, until they recruited some more.<\/p>\n<p>RICHARD New contractual forms will arise over requirements in the Building Safety Act. This was Chris Hall saying that basically to some extent it\u2019s going to be organic because it will happen out of necessity rather than someone actually taking a positive decision to do it.<\/p>\n<p>GEORGE We\u2019ve been working through this now for almost a year and some of changes that are going to have to be brought in by the new legislation are profound. And the point that that\u2019s covering is basically the change in PCSAs and design &amp; build because contractor design portion is something that needs to be done before gateway 2. The significance of that is fundamental as far as procurement is concerned. And what was interesting from that meeting that we had last week on this is that Will Cousins from Metropolitan Thames Valley said that that\u2019s what they\u2019re doing now.<\/p>\n<p>David Poat from Notting Hill Genesis said that they\u2019re also discussing that at the moment and we\u2019re also finding in the market place main contractors are also moving that way because the risk is just too high to go into construction without the design being nailed because that could have a massive impact on delays. Has anybody else got any experience? Is that something, Paul, that you\u2019ve heard that Peabody are doing?<\/p>\n<p>PAUL ECCLES We\u2019re just about starting our first tall building projects under BSA, so we\u2019re still finding our way along the line, like most people (including the Regulators). But the challenges we\u2019ve got in procurement and appointing the right people is mostly around the PD for building regs. Because there is no history, there is nothing to base our benchmark on, it\u2019s our best endeavours in trying to get that sorted. And unfortunately, we\u2019ve got a design &amp; build contractor involved in that and their view is to try and get the tendering process done two weeks before submission is OK, and I don\u2019t think it is. I think it\u2019s going to be a lot of delays on that one, but we\u2019ve got to wait and see what goes on.<\/p>\n<p>We\u2019re working with the Regulators as closely as we can, but the whole procurement process is up in the air because there\u2019s new law as well now that came in October last year, the new procurement regulations and that comes into effect in October this year. For me as a health &amp; safety practitioner I base all of my procurement assessments, because I\u2019m also CHAS trained, on CHAS assessments, so I\u2019m looking at health &amp; safety, compliance and competence to carry out the work. And that\u2019s sightly different from what other people in the process are looking at and understand, so it\u2019s best if we talk amongst ourselves and try and get the best ideas, if we\u2019ve got experience with Regulators, as to what the Regulator is thinking and doing because I don\u2019t think they have a firm idea yet.<\/p>\n<p>GEORGE That\u2019s definitely the purpose of these sessions and that was the context in which I was asking whether people were aware of what we\u2019re doing. We\u2019re going to be feeding the outputs from this back to the Regulator because at the moment the Regulators aren\u2019t going to be explicit in terms of what they are wanting. So they\u2019re expecting the industry to come up with it, and I think that\u2019s the only way that it\u2019s going to work, but the industry, there isn\u2019t a coordinated view. To my knowledge, we as BIM4Housing are the only ones who are actually doing this, so that\u2019s why we\u2019ve picked these particular topics. I think what would be very useful is when we finish this you\u2019ll find it very interesting to read the notes that people like David Poat and Will and others have made on this. And obviously any contributions that you could make would be very welcome. Have we got another developers on?<\/p>\n<p>RICHARD Considerations at design stage. So, in terms of planning and design, product information standards, risk assessment and quality assurance.<\/p>\n<p>GEORGE One of the comments there is that there is concern about manufacturers becoming seen as designers. We need to get them involved earlier, but it\u2019s got to be in a context where they don\u2019t end up with design responsibility. And I guess that\u2019s what Paul\u2019s saying, the principal designer is such a critical role in this.<\/p>\n<p>JESSICA WARD I\u2019m a programme manager at A2Dominion Housing Association. I was going to chip in, where to start, interesting listening to the conversation around the principal designer. we have architects that we work quite closely with who\u2019ve positioned themselves and demonstrated competency by being signed up to the RIBA approved list form PD and thinks like that. We\u2019ve also got design &amp; build projects and contractors who are gathering their architects that they can work with to provide that PD role, so it\u2019s not all being approached in the same way.<\/p>\n<p>But I would say that with regard to the product suppliers we do have a large cladding remediation project where this has become a bit of an issue where the product manufacturers have been very engaging on the systems that we\u2019re going to use. It\u2019s a big enough project for them to offer a lot of design support, but when push comes to shove are they going to provide the warranties for that? That\u2019s a whole different board game.<\/p>\n<p>RICHARD This next point is around using digital tools. In terms of integration of products and assets that will be largely done through classification and structure of the information so that systems are properly classified and the asset types that are part of the systems are properly classified so that they can be properly integrated.<\/p>\n<p>GEORGE I think that is an answer to the question. Part of the challenge that we\u2019re being asked to consider is how we\u2019re going to be glueing all of this stuff together. What I\u2019m saying there is that if we follow the detail of how things should be properly classified and structured it all comes together. The question is is that being policed? And therefore we need to improve the process of really ensuring that people are held to account on that because if something hasn\u2019t been properly classified - I don\u2019t mean just the product, but how it\u2019s being used in the building, so spaces have got classification, systems have got classifications. So rather than using just the description that somebody happens to put in the BIM model, actually the classification enables it to be glued together.<\/p>\n<p>Just to explain that we had somebody on who\u2019s one of the specialists in product information and GS1 and that type of classification. So he was talking extensively about having unique identifiers, which I agree with.<\/p>\n<p>RICHARD The key that holds this peg together in terms of this information thread regarding maintenance information, basically everything, again it needs to be this unique identifier, because there is nothing to tie it back to otherwise, which I think makes sense. Has anybody got anything to add to that section? OK, this section was around installation stage. The point is a thorough risk assessment is essential to optimal installation. Does anybody disagree with that? OK, installation: Mandatory installation accreditation should be implemented. Any disagreement on that one?<\/p>\n<p>GEORGE Is there anybody on the call, John Morrow, I think you\u2019ve been on some of these sessions?<\/p>\n<p>JOHN MORROW Yeah, quite a few of them.<\/p>\n<p>GEORGE I\u2019m just wondering if there\u2019s people on the call who\u2019ve already contributed to this\u2026we\u2019re bringing together expertise, we\u2019ve had over 100 people look at these and we\u2019ve got a really good set of information. But obviously before we send it through to DLUHC we want to make sure that you\u2019ve all had the chance to comment on them.<\/p>\n<p>RICHARD Also, we didn\u2019t finish all of the questions, like this one. The second part, mandatory installation accreditation should be implemented. So the question is how.<\/p>\n<p>EDWARD COSTER I wasn\u2019t going to answer that question, but it was more about actually we need some kind of framework around how exactly do we record all of this. Because we\u2019re going to do all of these things, but we need some sort of agreed protocol to say this is what we\u2019re going to record, that\u2019s very important to wrap around all of this. And then when it comes to accreditation, we\u2019re going to apply similar frameworks to the one\u2019s we have in place for product testing and quality control. And there are installer schemes already in place, in many sectors, not just fire safety and it\u2019s about how do we mandate those. Do we go down the gas route, the electrical route, where you can\u2019t work on these things unless you\u2019ve got the ticket. There\u2019s accreditation systems in place for fire stopping.<\/p>\n<p>RICHARD for fire door installation there is accreditation now.<\/p>\n<p>EDWARD COSTER Yeah, they\u2019re not mandatory in that same way that working on a gas appliance is, it\u2019s mandatory to be a member of one of those installer schemes and likewise for electrical works, Part P works. It would require legislation if it\u2019s going to be mandatory.<\/p>\n<p>GEORGE BM Trada is one example of that, Richard.<\/p>\n<p>RICHARD No, I\u2019m thinking of your story of the new build, they inspected the fire doors that had been installed and 75% of them didn\u2019t pass. So that\u2019s why I was querying about the accreditation, does it actually work?<\/p>\n<p>JOHN MORROW We normally within our ERs and\u2026procurement documentation, that\u2019s one of our requirements for fire door installations, but then as part of that process we use a third-party assessor to look at the actual installation. Because we\u2019ve gone with some of the largest providers across the country with door sets that have primary test certification and we have still found issues. I can think of one scheme where 70% of the door sets were not up to scratch, there were issues. And yet they were with a supposedly accredited installers.<\/p>\n<p>GEORGE Yeah, part of the issue that I\u2019ve certainly heard criticism of is, for example, BM Trada, I\u2019ve no idea if that\u2019s a good scheme or not, but it\u2019s obviously widely implemented. But the person that\u2019s actually doing the install doesn\u2019t need any accreditation, they need to work with somebody that does have it.<\/p>\n<p>JOHN MORROW That\u2019s what happens in reality, that\u2019s what we found because installers have to be accredited, BM Trada being one, then this instance that I\u2019m referring to, that was exactly the case. But I think what the reality is on the ground, as used to happen with gas installations, you\u2019d have fitters carrying out the install and then one licensed individual signing the commissioning certification on all 20-40 installations and a similar thing is happening here with the doors. Because the quality of workmanship on the scheme I\u2019m referring to was shockingly bad.<\/p>\n<p>REBECCA FRANKS I agree because we\u2019ve been working with our contractor to get them BM Trada accredited and what I\u2019ve found out through the process, one accredited installer can then oversee 20 installers underneath them. So they can\u2019t get round and monitor 20, obviously BM Trada seem to think they can, but that\u2019s one of the problems we\u2019re encountering, it\u2019s subject to who fits the doors. And that\u2019s where the problems lie because it\u2019s too broad.<\/p>\n<p>PENCHO STUDENKOV I previously mentioned this obviously in our specification we actually specify how many\u2026one supervisor, the number of operatives that they can actually supervise. We\u2019ve already put that in place as a contractual agreement. And just to mention it\u2019s not just fire doors, it\u2019s all across the fire stopping as well, so PFP accreditations. I\u2019ve actually seen situations where there\u2019s operative with zero background in fire stopping and just because they\u2019ve been put on a training list it\u2019s allowed by the accreditation body to actually operate and to install fire stopping products, not even supervised onsite on that day.<\/p>\n<p>But I think what we\u2019ve done, obviously it\u2019s not a very proactive kind of approach, is just to specify those individual requirements through that training matrix. So we specify specifically what it is that we want from the company accreditation point of view, but also individuals. So we have a set of specific requirements for the supervisors, all sorts of training and accreditation they need to meet and then obviously we have every single person from that chain onboard.<\/p>\n<p>GEORGE I had a discussion with Land Securities about this a couple of weeks ago and what my contact was saying is that he\u2019s now trying to build into all of their projects, there\u2019s an inspection. He told me that the fire door installation has got to be inspected by a third-party afterwards. He wants to bring forward the fire door inspection, the independent third-party should be doing the inspection before handover. And he\u2019s getting pushback from his procurement people because that\u2019s increasing the price and he\u2019s obviously trying to stand up to that fact. Does that make any sense with anybody?<\/p>\n<p>JOHN MORROW There is definitely a cost implication for that. That\u2019s what we\u2019ve done previously to resolve issues, the fact that it\u2019s underwritten by a third-party brings a certain level of assurance but in every instance where we\u2019ve procured their services where we haven\u2019t been able to do it within out our own, we\u2019ve got specialist fife safety surveyors. We've always found issues and it\u2019s always been very difficult to get to resolve issues, one to acknowledge them and then to resolve them. Obviously we won\u2019t take occupation as part of the FRA process, so we wouldn\u2019t take occupation without them matters being resolved, but it\u2019s difficult.<\/p>\n<p>GEORGE But to answer this particular point which seems to be a common problem if, for example, most developers like you and obviously Peabody and I don\u2019t know where you\u2019re from, Rebecca.<\/p>\n<p>REBECCA FRANKS I\u2019m in local government, I\u2019m a building safety manager for Hull City Council and I\u2019ve managed 23 buildings now.<\/p>\n<p>GEORGE so if it became a recommendation through our community that there ought to be a third-party inspection of every installation, then that could make it easier for people like the guy from Land Securities to get that through. Because it becomes best practice because beset practice is what people should be working towards. Does that make any sense?<\/p>\n<p>REBECCA FRANKS It does, the problem is if you\u2019ve got an accredited installer undertaking the works then in theory you shouldn\u2019t need a third-party to go singing off accredited works. That\u2019s one of the things we were working with and that\u2019s what I\u2019ve developed because we had door installers which were just joiners, but then we had a third-party coming in and signing off each individual door, so that\u2019s why we\u2019ve gone down the BM Trada accredited route. It\u2019s only going through that process that I found only three people in the organisation now are accredited, but they\u2019re managing trades people underneath them. It\u2019s too what extent I agree with it and I like the idea of a third-party sign-off, it\u2019s just what competence level will they have to have to be able to do that sign-off?<\/p>\n<p>PENCHO STUDENKOV I\u2019d like to echo Rebecca and say that yesterday I had completed a fire door desktop review for our scheme and I noticed that the IFC certification scheme that is the S4 certification scheme. And what\u2019s interesting in the scheme is that they are sending auditors to audit the contractor to some random site inspections and I\u2019ve received the report and this is the first time i\u2019ve actually seen this kind of level of details in the report. Not just inspecting the workmanship, but more crucially the certification, whether or not the door installing onsite is the door that has been specified and it aligns with the certification for that door.<\/p>\n<p>But I think the third-party accreditation, maybe we can actually specify that we need those kind of audits to see that they\u2019re actually being audited, because what is the point of having a third-party installer if we\u2019re not 100% sure that they\u2019re actually doing their job, if the supervisor is not doing their job with the operatives not recording what\u2019s they\u2019re supposed to be recording. so a little bit more strict specifications: this is what we need, these are the approval accreditation schemes and we already know that if the contractor is to that scheme they will capture this kind of level of detail. They are acquired to produce reports at the end of the installation, capturing before and after photos and all of the level of details.<\/p>\n<p>RICHARD From the answers we\u2019ve had further up the page, that accreditation is in process, it\u2019s happening but it\u2019s just not there yet.<\/p>\n<p>GEORGE That type of thing is going to make it a lot easier for the principal designer and principal contractor to satisfy their responsibilities. And the insurers.<\/p>\n<p>RICHARD Absolutely, and that organisation that Chris was talking about is working on design accreditation as well now. OK, there\u2019s just one little thing at the bottom that installers should use digital tools to ensure easy access to installation guides.<\/p>\n<p>EDWARD COSTER A quick one on that, and it carries on from the point that Pencho made which is actually what we need to see is their mandatory scheme which are UKAS accredited so that they meet a certain standard with the right kind of audits in place. That\u2019s the key bit because I\u2019m very aware there are some organisations out there that present themselves as accreditation services, but they\u2019re really not because they don\u2019t maintain any real level of standards, other that you pay them money and they\u2019ll say that you have been trained and certified to install fire stopping products.<\/p>\n<p>RICHARD Question 2: how do we ensure that the incomplete building services design does not impact construction? The overall considerations on this were around stakeholder engagement, as in timely engagement of stakeholders, utilising technology such as 3D modelling, conducting gap analyses, and also technology dealing with competency and compliance management. And the third section was on simplifying fire safety regulations. The first thing is a clear project timetable, one would think that would be self-evident, but possibly not. It\u2019s accepting that things are going to cost, to actually implement everything thats\u2019s set down in the legislation and guidance, it\u2019s going to cost to do it properly. And there\u2019s got to be a recognition by the industry that there is going to be a cost involved and it\u2019s as simple and complicated as that. Basically the solution is in the technology. It\u2019s like what you were saying, Rebecca, but with a slightly different slant: if the technology is there and it\u2019s good, why do you need third-party assessors? George, why don\u2019t you answer that question?<\/p>\n<p>GEORGE I can\u2019t see how technology is actually going to\u2026this is about incomplete building services design. I\u2019m just looking at the context of that.<\/p>\n<p>RICHARD Yeah, so that\u2019s not really the technology that\u2019s going to complete that, it\u2019s just going to make it available what\u2019s been done.<\/p>\n<p>GEORGE Yeah, I think Peter misunderstood, because he doesn\u2019t come from this industry, he comes from oil and gas. I think part of the principle here is that the building services element, if the building services design isn\u2019t completed before, for example, compartmentation is installed (I\u2019m talking about dry lining and the like), the builders work holes probably will be in the wrong place or the wrong size. Os the solution to this particular common conundrum is that the building services design needs to be completed before construction work starts. So I don\u2019t think technology is a solution to this.<\/p>\n<p>RICHARD Yeah, it\u2019s a tool, it\u2019s not an end result.<\/p>\n<p>PAUL ECCLES Since Grenfell we\u2019ve been photograph evidence of every passive fire protection measures, fire doors, everything onto Boris or Bolster. That\u2019s fantastic, it gives you evidence that it\u2019s all done properly, but when you\u2019re reviewing it to make sure that it\u2019s compliant it takes a lot of manpower and resources to do that. Technology is only great if you\u2019ve got somebody to check that it\u2019s actually correct and I don\u2019t think AI is up to that at the moment. The main fundamental problem is not necessarily the evidence, it\u2019s having confidence in your contractors. We\u2019ve been talking about third-party accreditations, that\u2019s great but as long as you\u2019ve got an industry that operates on a very low profit margin and crucial things get hidden during construction there\u2019s an opportunity to cut corners to save money. And until that is resolved we\u2019re still going to have this problem.<\/p>\n<p>JOHN MORROW We\u2019ve found that even with our very highest performing contractors with regards to PFP passive fire stopping arrangements, they still need careful management. There\u2019s no room for us to take a slightly more relaxed approach that we\u2019ve realised, you still need resource to do that.<\/p>\n<p>GEORGE The other challenge I\u2019d imagine is that when you\u2019re engaging with the contractor, John, you\u2019re probably dealing with the main contractor. The main contractor would then subcontract things like building services and then the building services contractor would then subcontract some of the installation work and even the fire stopping. So you can lose the connection there, can\u2019t you?<\/p>\n<p>JOHN MORROW Yeah, and that loss of connection is a loss of control, so we can make observations and suchlike, but we\u2019ve got no control over it, that\u2019s the difficulty.<\/p>\n<p>RICHARD What Peter goes on to say which is again around accreditation and competence is that competence is a continuum. It\u2019s not something that you take a test and that\u2019s it because a) you forget things and b) things change. He\u2019s saying that the linking of compliance with competency and with the management of risk in one technology platform is an elegant way of possibly dealing with that. George, would you agree with that?<\/p>\n<p>GEORGE I don\u2019t agree with the one technology platform. I think Peter was saying that, with the greatest respect, it\u2019s because he is selling a technology. I\u2019m a technology provider as well, but I wouldn\u2019t recommend that somebody just uses one technology platform. Because as Paul said there is a range of different software applications that are very good at doing certain things, the problem is how they interface with each other. Bolster is a good example of that.<\/p>\n<p>RICHARD Does anyone disagree with what George is saying around one technology platform? (<em>there is no response<\/em>). Basically it\u2019s about the standardisation of the way that data is held, so it\u2019s interoperable. People will be using different software applications for different purposes and what we need to do is to make sure that there is an adequate and robust ecosystem. And again, back to the unique reference number, just like having a VIN number, each building, not just the assets, but each building has a unique reference number provided by the local council. So that any information can be stored under that unique reference number.<\/p>\n<p>GEORGE Could I ask a question on this, the UPRNs, there\u2019s obviously quite a few developers and owners on the call. The UPRNs as a term is managed by the Ordnance Survey nationally for all properties. Housing associations also use the term UPRN and I wanted to check whether it is the case that that\u2019s completely abstract from the Ordnance Survey UPRNs, or whether there is some sort of alignment there.<\/p>\n<p>PETE PATON I\u2019ve worked for several housing providers and the use of we\u2019ll call it the statutory UPRN is not consistent across all organisations. Some organisations when they use the term mean the unique property reference number that their housing system has given that dwelling\/block and there can be different UPRNs obviously for both the apartments and the blocks. Some organisations do use the statutory UPRN, so there is a level of inconsistency and also a level of sometimes misunderstanding because some individuals who are familiar with the statutory UPRN assume that the UPRN is indeed the statuary one when, on occasion, it\u2019s not. So your statement is correct in that there is no consistency and there is no mandatory or statutory requirement for housing providers to use that, they can use their own reference number that\u2019s on their housing management of asset management system. It brings a lot of inconsistency, especially where the fire services are using the statutory UPRN and then they\u2019re presented with a stock list and they don\u2019t match and then you\u2019ve got to explain why they\u2019re different. The VIN number comment is exactly that, if the organisations and the software providers indirectly linked to the statuary UPRN then we\u2019d be in an easier place.<\/p>\n<p>EDWARD COSTER That\u2019s exactly my experience as well, so I think that\u2019s probably fairly common. Some organisations use the national UPRN number and some don\u2019t, and they use their own internal numbers and there\u2019s all the confusion around that. A lot of people don\u2019t realise that there is a national system.<\/p>\n<p>RICHARD Why do they do that? Surely if there is a national system it makes sense to use it.<\/p>\n<p>EDWARD COSTER It\u2019s beyond me. I don\u2019t know all of the workings of it, my suspicion is that it might have been clunky at times. Unlike a lot of other government systems, maybe this one didn\u2019t work very well.<\/p>\n<p>PETE PATON And I imagine the statutory address list, there is a time lag between that being set up and the construction phase and completion phase of a set of buildings. Don\u2019t start me on the meter point reference numbers as well and their lack of association with the UPRN. I suspect that there might well be some form of royalty that needs to be paid in order to use the statutory UPRN number, that\u2019s just a suspicion, not a fact. That might be a reason that influences the use.<\/p>\n<p>RICHARD OK, this comes out to George\u2019s point about the building services design not being complete when construction starts. The design itself needs to be completed earlier and then the information about the products that are going to be used needs to be simple to be able to drop into the evolving design. And Peter again says that use a methodology, digital stage case and again about the continuum, this time the golden thread in the construction projects has also to go through stage gates. There needs to be clarity for what is being used in overall design because to actually change the standards is an exceptionally long process.<\/p>\n<p>So, this is around British standards and best practice and guidance and the consistent use of same. One thing we could perhaps be doing is looking more at scenarios so that we can see which of the building regs is relevant at which stage. You spoke about Regulation 38 which is one of the key ones, which determines which asset types are critical ones.<\/p>\n<p>GEORGE What we found over the last few years is the best way of getting knowledge exchange from people is to actually give them a scenario and ask them to use what they know to resolve the issues in that scenario. So that\u2019s a part of what we\u2019re saying there. Giving them a problem and then applying their knowledge to come up with the solution.<\/p>\n<p>RICHARD Paul\u2019s saying we should be looking at changing the regulations, but we might need to simplify the guidance. To simplify the guidance, do you think that is a good idea?<\/p>\n<p>REBECCA FRANKS I think it\u2019s a good idea.<\/p>\n<p>EDWARD COSTER I think perhaps the distinction needs to be made between making it clearer because it should only be as simple as it needs to be. Simple guidance is great if we\u2019ve got simple buildings.<\/p>\n<p>JOHN MORROW That\u2019s the important part, it\u2019s clarity as opposed to simplifying as dumbing down. But clarity is better.<\/p>\n<p>RICHARD This is consideration at design stage, so we\u2019re talking about understanding the designers duties and responsibility. Well-structured planning and design processes which is echoing something earlier. The importance of a complete design, how to prevent design issues and complete service design for better outcomes. We need to map it, that\u2019s pretty clear. we need to have a more structured methodology of roles and responsibilities. George, do you want to expand on that?<\/p>\n<p>GEORGE So, what we\u2019re really trying to do is we\u2019re recognising that the principal designer isn\u2019t designing everything and the principal contractor isn\u2019t building everything. So what a couple of the PDs that I\u2019ve been talking to have said is that they\u2019re looking for a more structured way of saying what\u2019s expected\u2026if an architect is the PD, they\u2019re not the experts in structure, so therefore there needs to be some sort of mechanism whereby they can provide the assurance to the PD to the fact that they\u2019ve carried out work and also that it\u2019s compliant with building regs. So there needs to be some method of doing that. I don\u2019t know if there\u2019s any designers on that call who are looking to provide that role. To some extent, this is what Paul was saying earlier, if he\u2019s talking to people. There is now a duty of care on clients to ensure that the PDs are competent, so how do you go about doing that?<\/p>\n<p>RICHARD That\u2019s the question, that\u2019s what this document is all about, the how.<\/p>\n<p>PETE PATON It\u2019s a topic that is getting a lot of time at the moment and there are organisations. First of all, on the client side, I\u2019m not a provider of the design details and we\u2019ve been knocking on RIBA\u2019s door. You\u2019ll know that RIBA has a course out at the moment on PD associated with the building regs and so do the Building Safety Regulator.There was one that was subscribed within 48 hours and was fully attended and I think the next one is later on this year. The RIBA folks have issued a toolbox to help you navigate through that process. I\u2019m doing the course at the moment, not because I want to be a principal designer, but because I want to understand the process as well as I can.<\/p>\n<p>There are views that ? 1hr 6mins 50 secs are more aligned with architectural practices and there are views that the duty is better aligned with the PC and the PC then subcontracts that out to a relevant competent practice. So getting back to your question, how do you do that. I understand that the legal position is that you are that the client is expected to carry out due diligence to determine that the organisation that\u2019s providing that service of PD under the B regs has organisational competence. And if the Building safety Regulator was in the room he or she would say that you determine competence in the same way as you do for any other duty. And they will use the words, you\u2019ve got to consider that they have the necessary skills, knowledge, experience and behaviours.<\/p>\n<p>Which is a bit of a challenge because this is a new duty. It\u2019s not completely unfamiliar territory in checking competence, but it\u2019s purely about\u2026I\u2019ll put it clearly rather than simply, but it\u2019s simple to me in my head and that is check that the organisation has the skills, check that they have the experience, check that they have the knowledge and document that. In the same way as if you\u2019re appointing a gas engineering organisation to carry out your gas services for the next five years. That\u2019s a standard process during the tendering process, but of course the Regulator is expecting you to do that at the outset and also during the course so that if there are any material changes within your organisation, as a client you\u2019re making sure that those changes aren\u2019t having a detrimental effect on the competence.<\/p>\n<p>So let\u2019s pretend that it\u2019s been provided by two individuals within an organisation and they leave. Does that mean the organisation still has the competence. Well, yes if they appoint someone else within that organisation that carries out the organisational duty to the contract and to the client. So simply, it\u2019s a case of checking those four things and evidencing that and reviewing it regularly, in the same ways you would for your old gas engineers. The organisation has got the engineers with the competence and it\u2019s the same engineers that are doing that work during the course of a contract which could last for 2, 5, of the development could last for 2, 5, 15 years depending on the scale of the scheme.<\/p>\n<p>So, clearly that\u2019s the best clear way I can put it, in the same way as you\u2019d consider any other professional appointment and determine the competence. And of course sometimes that has been because they\u2019re the organisations that we\u2019ve worked with for the past 10 years, we trust them and we know their practice, we know the individuals and off we go. The expectation now with the Regulator in the room is to evidence that that step has been taken and that you\u2019re regularly checking it to make sure that it\u2019s still as valid midway during the contract as it was at the outset.<\/p>\n<p>JOHN MORROW We\u2019ve been reviewing that circumstance ourselves and that is kind of the approach that we\u2019re taking because we\u2019ve got a compliant framework of contractors and consultants and we\u2019re assessing the organisational competencies at that initial stage. And then assessing the project team members at the individual contract stage as well. We haven\u2019t got as far as the checks that we should be undertaking during the construction phase to capture any changes, the personnel changes and such like. So that\u2019s the approach that we\u2019re currently looking at.<\/p>\n<p>RICHARD So what we\u2019re seeing is everybody is doing it slightly different, people have different approaches to actually getting round these issues. You\u2019ve got to be compliant so you follow the rules but it\u2019s a question of how you do it and that seems to be varying a lot.<\/p>\n<p>GEORGE It would be interesting, Pete, to delve into that a little bit more. One of our long standing contributors to BIM4Housing is Steve Coppin. He ran the training courses for CIOB until very recently and he\u2019s stepped down from that because he doesn\u2019t agree with the way they\u2019re doing it. And what he said is that this is a problem with all of the institutions in that they\u2019re certifying and providing training for the individuals, but not for the companies. It\u2019s understandable because RIBA\u2019s members are the individuals, but if you\u2019re working for a company then no matter how good your competence and how diligent you are unless the culture is right within the organisation that doesn\u2019t work either. So I\u2019d be interested to know a little bit more.<\/p>\n<p>PETE PATON Yeah, and I think many organisations are trying to find their way with it and of course the Regulator won\u2019t state that this is the way that you should run your business and this is the way that you should establish competence. Because they\u2019ll take the view, and rightly so, that we have organisational expertise and that aspect of it to know how to do it. And I\u2019ll use the same analogy about the gas engineer, the gas engineer is individually competent through his Gas Safe qualification. And that sits with the individual, not with the organisation, but as you say there\u2019s got to be organisational competence. And as John touched on what we\u2019re trying to do is map that process out to make sure that we can demonstrate that we\u2019ve got a policy, a standard operating procedure in place that navigates that route and allows us to make sure that we can demonstrate the competence should we be called to demonstrate that that step took place.<\/p>\n<p>So it\u2019s straightforward to me. I think what we\u2019re also going to bump into is where principal contractors and professional practices that are going to offer that service separately. Can position the appropriate level of insurance that clients are comfortable with under their standing orders and financial regs and insurance requirements under any tendering and pre-award arrangements. John mentioned that he\u2019s looking at the framework arrangement, I\u2019m about to reach out to a procurement team and ask if they will reach out to the existing procurement framework members and ask them if they can do a poll of those contractors and practices that are on the frameworks and ask which of them are prepared to provide the PDE duty on a consultancy basis or an appointment basis.<\/p>\n<p>Because as John will have known the existing procurement frameworks doesn\u2019t feature PD under the building regs because a lot of the framework arrangements were set up prior to that. Great if you look for a generic fire engineer, a general consultancy, if you\u2019re looking for design support, yeah, you\u2019ll get it because that\u2019s an established process. Whereas this relatively new PD building regs duty hasn\u2019t quite made it to the procurement framework.<\/p>\n<p>Also the JTC\u2019s suite of contracts will be updated and issued on the 17th of April. I\u2019m certainly interested to see what degree of inclusion of the new building safety obligations and the secondary legislation duties will be incorporated in that. I\u2019ve not seen a pre-release of it. I\u2019m aware that you can purchase a hard copy of the changes, but I believe that the changes document won\u2019t be available digitally. That can be pre-ordered for it to arrive on the 18th of April. That may cater for the PD aspect of it as well and may cater for many other aspects of it, but I don\u2019t know yet.<\/p>\n<p>GEORGE One of the things that\u2019s worth mentioning is that I spent several years working on the integrated project insurance contract, JCT were involved in that, Thomas Selford. But that is probably something that people need to be looking at now because integrated project insurance removes the PI from the individual organisations and makes it a project PI which is a collaborative approach and it means that there is no risk transfer. Which is I think going to be needed in a lot of these new projects. If anybody is interested in learning more about that let me know.<\/p>\n<p>RICHARD OK, so the conclusions that have been come to on this section, basically the design should be finalised before the construction begins to avoid mistakes and uninformed decisions. Design states should be kept to a minimum to prevent budget overspends. I can\u2019t imaging anyone disagrees with that.<\/p>\n<p>GEORGE Also, the design changes should be kept to a minimum because under the change control process you could end up with six weeks delay for each change that could be very significant.<\/p>\n<p>RICHARD This is another good one, the client needs to set out at the very beginning the level of information that they and their consultants are looking for. It needs to be top down and it\u2019s got to be digital.<\/p>\n<p>GEORGE I\u2019m not sure that should be consultants, I think that\u2019s more\u2026we need to take a look at that again, Richard.<\/p>\n<p>RICHARD The publication of a competency demand profile related to the project and design, should be required. Right, this is about rethinking procurement processes. Phil Thompson says it needs to be split in two, you\u2019ve got the labour element of procurement and the product element of procurement. And again they can be covered by improvement in identification and digital adoption. And we need to be helping the procurement team to understand the implications of them maybe de-scoping something to save money.<\/p>\n<p>GEORGE Martin Oates that\u2019s mentioned there, he\u2019s from a manufacturer, but a manufacturer that also does design and installation, He\u2019s from SE Controls. They make smoke vents but they also design smoke control systems.<\/p>\n<p>RICHARD This comment is saying that procurement teams don\u2019t take account of design elements or the technical content unless they\u2019re explicitly given information. That\u2019s around briefing, isn\u2019t it. Construction stage considerations, that\u2019s about the coordination between build and M&amp;E design and halting construction when it\u2019s necessary. Basically until design issues are resolved. We didn\u2019t finish that question about coordination between build and M&amp;E design that a lack of coordination can lead to compromises and potential dangers. This suggests that starting the process with modular builds can improve construction outcomes.<\/p>\n<p>JOHN MORROW We do a lot of work with regards to dealing with those potential dangers and the retrospective changes to the actual installation arrangements in regards M&amp;E and such like. That\u2019s a big factor for us in regards to notifying them and rectifying them before they\u2019re covered up and encapsulated and such like. Ceiling wall details and such like, that\u2019s always an issue for us.<\/p>\n<p>GEORGE And at the moment you\u2019re capturing that as photographs, are you?<\/p>\n<p>JOHN MORROW Yes, we do it exactly like that, we evidence it and then before and after shots by way of to record the completion of the remedial works.<\/p>\n<p>GEORGE And do you do that on jobs where you\u2019re the Section 106?<\/p>\n<p>JOHN MORROW Yes, we do. And it doesn\u2019t make it very popular, but yes we do it on every scheme.<\/p>\n<p>GEORGE Have you been doing it on Mediers? 1hr 25mins 10secs House?<\/p>\n<p>JOHN MORROW Yes, we got involved at the later stages because sometimes with the 106s the construction phase is well advanced and we come to the party late in the day. But we do our best to capture that on every scheme.<\/p>\n<p><strong><u>CHAT<\/u><\/strong><\/p>\n<p><strong>Paul Eccles<\/strong><\/p>\n<p>As mentioned: <a href=\"https:\/\/www.gov.uk\/government\/publications\/collaborative-procurement-guidance-for-design-and-construction-to-support-building-safety\" target=\"_blank\" rel=\"noopener\">https:\/\/www.gov.uk\/government\/publications\/collaborative-procurement-guidance-for-design-and-construction-to-support-building-safety<\/a><\/p>\n<p><strong>Pencho Studenkov<\/strong><\/p>\n<p>Have a look at the SDI 00, SDI 14 (timber doors) and SDI15 (steel doors) - IFC accreditation + rigid contractor's specifications to ensure they have been audited and provide all audit reports.<\/p>\n<p><strong>Pete Paton<\/strong><\/p>\n<p>George\u00a0Stevenson\u00a0It looks like UPRN usage had a royalty charge related to it;s use, which appears to have become royalty free since 2020 <a href=\"https:\/\/www.geoplace.co.uk\/power-of-place\/becoming-open-and-royalty-free\" target=\"_blank\" rel=\"noopener\">Becoming open and royalty free | GeoPlace LLP<\/a><\/p>\n<p><strong>Pete Paton<\/strong><\/p>\n<p><a href=\"https:\/\/corporate.jctltd.co.uk\/jct-announces-release-of-2024-edition-of-contracts\/\" target=\"_blank\" rel=\"noopener\">JCT Announces Release of 2024 Edition of Contracts \u2013 The Joint Contracts Tribunal (jctltd.co.uk)<\/a><\/p>\n<\/div>\n<\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>BIM4HOUSING DEVELOPMENT WORKING GROUP MEETING 27-03-2024 RICHARD We\u2019ve got another four sessions next week, so we thought it would a good idea to run through with the development group what we\u2019ve done so far and then maybe you can give us a steer on what we\u2019re getting right or wrong and to add some input&#8230;<\/p>\n<p class=\"more-link\"><a href=\"https:\/\/bim4housing.com\/development\/bim4housing-development-working-group-meeting-27-03-2024\/\" class=\"\"><span>Read More<\/span><i>&#43;<\/i><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-211","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BIM4HOUSING DEVELOPMENT WORKING GROUP MEETING 27-03-2024 - BIM4Housing Development<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bim4housing.com\/development\/bim4housing-development-working-group-meeting-27-03-2024\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BIM4HOUSING DEVELOPMENT WORKING GROUP MEETING 27-03-2024 - BIM4Housing Development\" \/>\n<meta property=\"og:description\" content=\"BIM4HOUSING DEVELOPMENT WORKING GROUP MEETING 27-03-2024 RICHARD We\u2019ve got another four sessions next week, so we thought it would a good idea to run through with the development group what we\u2019ve done so far and then maybe you can give us a steer on what we\u2019re getting right or wrong and to add some input&#8230;Read More&#043;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bim4housing.com\/development\/bim4housing-development-working-group-meeting-27-03-2024\/\" \/>\n<meta property=\"og:site_name\" content=\"BIM4Housing Development\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-02T15:33:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"34 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/bim4housing.com\\\/development\\\/bim4housing-development-working-group-meeting-27-03-2024\\\/\",\"url\":\"https:\\\/\\\/bim4housing.com\\\/development\\\/bim4housing-development-working-group-meeting-27-03-2024\\\/\",\"name\":\"BIM4HOUSING DEVELOPMENT WORKING GROUP MEETING 27-03-2024 - BIM4Housing Development\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bim4housing.com\\\/development\\\/#website\"},\"datePublished\":\"2024-04-02T14:03:02+00:00\",\"dateModified\":\"2024-04-02T15:33:03+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/bim4housing.com\\\/development\\\/bim4housing-development-working-group-meeting-27-03-2024\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/bim4housing.com\\\/development\\\/bim4housing-development-working-group-meeting-27-03-2024\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/bim4housing.com\\\/development\\\/bim4housing-development-working-group-meeting-27-03-2024\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/bim4housing.com\\\/development\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"BIM4HOUSING DEVELOPMENT WORKING GROUP MEETING 27-03-2024\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/bim4housing.com\\\/development\\\/#website\",\"url\":\"https:\\\/\\\/bim4housing.com\\\/development\\\/\",\"name\":\"BIM4Housing Development\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/bim4housing.com\\\/development\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BIM4HOUSING DEVELOPMENT WORKING GROUP MEETING 27-03-2024 - BIM4Housing Development","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bim4housing.com\/development\/bim4housing-development-working-group-meeting-27-03-2024\/","og_locale":"en_US","og_type":"article","og_title":"BIM4HOUSING DEVELOPMENT WORKING GROUP MEETING 27-03-2024 - BIM4Housing Development","og_description":"BIM4HOUSING DEVELOPMENT WORKING GROUP MEETING 27-03-2024 RICHARD We\u2019ve got another four sessions next week, so we thought it would a good idea to run through with the development group what we\u2019ve done so far and then maybe you can give us a steer on what we\u2019re getting right or wrong and to add some input&#8230;Read More&#43;","og_url":"https:\/\/bim4housing.com\/development\/bim4housing-development-working-group-meeting-27-03-2024\/","og_site_name":"BIM4Housing Development","article_modified_time":"2024-04-02T15:33:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"34 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/bim4housing.com\/development\/bim4housing-development-working-group-meeting-27-03-2024\/","url":"https:\/\/bim4housing.com\/development\/bim4housing-development-working-group-meeting-27-03-2024\/","name":"BIM4HOUSING DEVELOPMENT WORKING GROUP MEETING 27-03-2024 - BIM4Housing Development","isPartOf":{"@id":"https:\/\/bim4housing.com\/development\/#website"},"datePublished":"2024-04-02T14:03:02+00:00","dateModified":"2024-04-02T15:33:03+00:00","breadcrumb":{"@id":"https:\/\/bim4housing.com\/development\/bim4housing-development-working-group-meeting-27-03-2024\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bim4housing.com\/development\/bim4housing-development-working-group-meeting-27-03-2024\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/bim4housing.com\/development\/bim4housing-development-working-group-meeting-27-03-2024\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bim4housing.com\/development\/"},{"@type":"ListItem","position":2,"name":"BIM4HOUSING DEVELOPMENT WORKING GROUP MEETING 27-03-2024"}]},{"@type":"WebSite","@id":"https:\/\/bim4housing.com\/development\/#website","url":"https:\/\/bim4housing.com\/development\/","name":"BIM4Housing Development","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bim4housing.com\/development\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/bim4housing.com\/development\/wp-json\/wp\/v2\/pages\/211","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bim4housing.com\/development\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/bim4housing.com\/development\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/bim4housing.com\/development\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bim4housing.com\/development\/wp-json\/wp\/v2\/comments?post=211"}],"version-history":[{"count":7,"href":"https:\/\/bim4housing.com\/development\/wp-json\/wp\/v2\/pages\/211\/revisions"}],"predecessor-version":[{"id":218,"href":"https:\/\/bim4housing.com\/development\/wp-json\/wp\/v2\/pages\/211\/revisions\/218"}],"wp:attachment":[{"href":"https:\/\/bim4housing.com\/development\/wp-json\/wp\/v2\/media?parent=211"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bim4housing.com\/development\/wp-json\/wp\/v2\/categories?post=211"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bim4housing.com\/development\/wp-json\/wp\/v2\/tags?post=211"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}